Monday (5/12): The sidewalk will be poured and the staging platform will be removed from under the arch.Seen today, building up the lower road:
Wednesday (5/14): Precast approach slabs will be placed.
Thursday (5/15): A membrane will be applied to the bridge deck.
And the endcap of the bridge: